Skip to content

RTA Opens Al Mustaqbal Street Bridge

The new 500-metre link reduces travel time from Dubai World Trade Centre to two minutes during major events.

By ABU DHABI2 min read

AI-assisted This article was drafted with AI assistance and reviewed by an AbuDhabi.News editor before publication. See our editorial policy for the full workflow.

RTA Opens Al Mustaqbal Street Bridge
RTA opens Al Mustaqbal Street Bridge to reduce travel times in Dubai. Photo by mediaoffice.ae
0

Dubai’s Roads and Transport Authority opened a new 500-metre bridge yesterday. The structure directs traffic from Dubai World Trade Centre and One Central buildings towards the intersection of Al Mustaqbal Street and Za’abeel Palace Street.

This two-lane bridge forms a key component of the Al Mustaqbal Street Development Project. It significantly cuts travel time from Dubai World Trade Centre down to two minutes during major events, compared to the previous ten-minute duration. The project extends from the intersection with Za’abeel Palace Street to Financial Centre Street.

The infrastructure upgrade comes with a total cost of AED 633 million. It features 2,000 metres of bridges and tunnels and expands Al Mustaqbal Street from three to four lanes in each direction. This expansion increases the street’s capacity by 33%, rising from 6,600 to 8,800 vehicles per hour in both directions. Additionally, the works reduce general journey times along the corridor from 13 minutes to six minutes.

His Excellency Mattar Al Tayer, Director General and Chairman of the Board of Executive Directors of the RTA, emphasized the project's alignment with broader urban goals. He noted the initiative is part of an integrated scheme that includes upgrading the World Trade Centre Roundabout, where completion has exceeded 85%. Al Tayer confirmed that another bridge will open by the end of August to serve traffic from Sheikh Rashid Road towards 2nd December Street, followed by the project’s final bridge in October for traffic from Al Majlis Street towards 2nd December Street.

Al Tayer highlighted the strategic significance of the location, linking Downtown Dubai with Business Bay. He stated the project enhances access to key financial and business destinations, supports investment and tourism flows, and strengthens the area's readiness for economic growth. This infrastructure is expected to bolster Dubai’s competitiveness and appeal as a global business and financial hub.

Work on the overall development is progressing ahead of the approved timeline, with completion exceeding 50%. Looking ahead to February 2027, the RTA plans to open three tunnels extending 1,500 metres at the intersection of Al Mustaqbal Street and Trade Centre Street. The project also incorporates aesthetic features such as upgraded pedestrian walkways, a cycling track, and decorative lighting to improve urban character.

How did this story make you feel?

Share this story

Follow Us

Written by

Gerard Urbanozo

Reporting from Abu Dhabi — independent, on the ground, and built on local sources.